PourGaugeHow much concrete you actually need, and what to mix into it.

Concrete Slab Cost by State — 400 ft², All 51

The figures price a 4-inch slab on grade. A driveway wants six inches and rebar, and that is not a small adjustment.

Slab cost varying across states
Slab cost varying across states

A 400 ft² poured slab — a 20 by 20 patio — costs $2,241 in Mississippi and $3,465 in Alaska, against a national figure of $2,600.

Concrete work is about half labour, and cement mason pay is published for all 51 jurisdictions, so the table below scales only that half and leaves material at national prices.

Every state

State Cement Masons and Concrete Finishers mean pay Labor factor Typical total Bid range
Alabama $45,600 0.759 $2,287 $1,407 – $3,871
Alaska $100,010 1.665 $3,465 $2,132 – $5,864
Arizona $59,530 0.991 $2,589 $1,593 – $4,381
Arkansas $45,700 0.761 $2,289 $1,409 – $3,874
California $70,920 1.181 $2,835 $1,745 – $4,798
Colorado $60,340 1.005 $2,606 $1,604 – $4,411
Connecticut $61,100 1.017 $2,623 $1,614 – $4,438
Delaware $60,700 1.011 $2,614 $1,609 – $4,424
District of Columbia $64,280 1.07 $2,692 $1,656 – $4,555
Florida $52,530 0.875 $2,437 $1,500 – $4,124
Georgia $49,240 0.82 $2,366 $1,456 – $4,004
Hawaii $85,470 1.423 $3,150 $1,939 – $5,331
Idaho $55,880 0.931 $2,510 $1,544 – $4,247
Illinois $77,800 1.296 $2,984 $1,836 – $5,050
Indiana $60,360 1.005 $2,607 $1,604 – $4,411
Iowa $57,830 0.963 $2,552 $1,570 – $4,319
Kansas $56,820 0.946 $2,530 $1,557 – $4,282
Kentucky $52,470 0.874 $2,436 $1,499 – $4,122
Louisiana $52,840 0.88 $2,444 $1,504 – $4,136
Maine $57,230 0.953 $2,539 $1,562 – $4,297
Maryland $54,340 0.905 $2,476 $1,524 – $4,191
Massachusetts $72,720 1.211 $2,874 $1,769 – $4,864
Michigan $58,670 0.977 $2,570 $1,582 – $4,349
Minnesota $70,730 1.178 $2,831 $1,742 – $4,791
Mississippi $43,470 0.724 $2,241 $1,379 – $3,793
Missouri $64,140 1.068 $2,689 $1,654 – $4,550
Montana $62,150 1.035 $2,645 $1,628 – $4,477
Nebraska $52,350 0.872 $2,433 $1,497 – $4,118
Nevada $64,150 1.068 $2,689 $1,655 – $4,550
New Hampshire $58,570 0.975 $2,568 $1,580 – $4,346
New Jersey $68,640 1.143 $2,786 $1,714 – $4,715
New Mexico $52,840 0.88 $2,444 $1,504 – $4,136
New York $72,630 1.209 $2,872 $1,768 – $4,861
North Carolina $47,210 0.786 $2,322 $1,429 – $3,930
North Dakota $56,800 0.946 $2,530 $1,557 – $4,281
Ohio $63,790 1.062 $2,681 $1,650 – $4,537
Oklahoma $46,030 0.767 $2,296 $1,413 – $3,886
Oregon $70,260 1.17 $2,821 $1,736 – $4,774
Pennsylvania $62,030 1.033 $2,643 $1,626 – $4,473
Rhode Island $66,020 1.099 $2,729 $1,680 – $4,619
South Carolina $54,150 0.902 $2,472 $1,521 – $4,184
South Dakota $48,800 0.813 $2,356 $1,450 – $3,988
Tennessee $48,690 0.811 $2,354 $1,449 – $3,984
Texas $49,270 0.82 $2,367 $1,456 – $4,005
Utah $55,480 0.924 $2,501 $1,539 – $4,233
Vermont $62,570 1.042 $2,655 $1,634 – $4,492
Virginia $52,900 0.881 $2,445 $1,505 – $4,138
Washington $81,900 1.364 $3,073 $1,891 – $5,200
West Virginia $50,610 0.843 $2,396 $1,474 – $4,054
Wisconsin $68,820 1.146 $2,790 $1,717 – $4,721
Wyoming $59,520 0.991 $2,589 $1,593 – $4,381

The thickness question comes first

The figures price a 4-inch slab on grade: a patio, a shed floor, a walkway.

A driveway that will carry a vehicle wants five or six inches with rebar, and that is not a marginal adjustment. The concrete volume rises by a third to a half, the steel and the deeper base come on top, and the labour to place and finish a thicker pour goes up with it.

A quote that looks cheap against this page is very often quoting four inches for a job that needs six. Ask for the thickness, the base depth and the reinforcement in writing.

Concrete is sold by volume; the pour is sold by area

A 4-inch slab uses roughly one cubic yard per 81 ft², so a 400 ft² pour is about five yards.

Two charges catch people on small pours:

  • Short-load fees below a full truck, which is typically nine or ten yards.
  • Waiting time if the crew is not ready when the truck arrives.

Two identical patios can differ by several hundred dollars purely on whether the truck waited, and neither figure appears in any published cost guide.

A four inch slab beside a six inch slab

Small pours price badly, and there is a reason

Labour is half this job, and on anything under about 300 ft² the fixed costs dominate. Mobilising a crew, setting forms and the truck itself cost nearly the same for 100 ft² as for 300.

That is why the per-foot price on a small slab looks poor, and why adding the walkway you were putting off until next year is usually cheaper done now than done separately later.

Alaska and Hawaii are at the top for a different reason

Most of this table is wages. The top two entries are wages and freight — cement, aggregate and steel all have to arrive, and that shows up in the material half which the model deliberately does not scale.

Treat those two rows as the most conservative in the table rather than the most precise.

What is not in the price

Thickened edges where a load-bearing wall will sit. A vapour barrier under a heated or interior slab. Rebar mats where an engineer specifies them rather than mesh. Saw-cut control joints beyond standard spacing. And any grading or drainage work around the pour, which on a sloping site can rival the slab itself.

Work it out

P
PourGauge

How much concrete you actually need, and what to mix into it. — PourGauge. Editorial policy