How much does a 1000 sq ft concrete slab cost in Hilo, HI?

A poured concrete slab in Hilo, HI
$7,876
1,000 ft² of slab · typical range $4,847 – $13,328
Typical total$7.88 per ft² of slab$7,876
Range you should see in bidsthree bids on the same scope normally land inside this$4,847 – $13,328
Labor portion50% of the job — this is the part that moves by city$3,938
Material portion50% — bought at national prices$3,938
Cement Masons and Concrete Finishers pay near HiloBLS does not publish a metro figure for cement masons and concrete finishers near Hilo, HI, so this is the Hawaii state average, SOC 47-2051$85,470/yr
U.S. mean for the same tradeSOC 47-2051$60,050/yr
Versus the national pricetrade pay here runs +42.3% against the U.S. mean+$1,376

Notes

  • Where the number comes from. The national price for a poured concrete slab is $6.50 per ft² of slab — poured slab pricing published for 2026, $4–$11 per ft² for a 4-inch slab on grade. Labor is about 50% of that. Cement Masons and Concrete Finishers near Hilo, HI average $85,470 a year against a U.S. mean of $60,050 — a factor of 1.423 — so the labor half is scaled by that and the material half is not. Source: BLS does not publish a metro figure for cement masons and concrete finishers near Hilo, HI, so this is the Hawaii state average, SOC 47-2051.
  • This one falls back to a wider average. BLS did not publish a metro-level wage for this trade near Hilo, HI, so the figure above is a state average. It is still the right order of magnitude, but a local bid carries more weight here than it would in a large metro where the survey has more responses.
  • What is in the price: excavation to grade, a compacted gravel base, forms, wire mesh or fibre, the concrete itself, placing, screeding, a broom or trowel finish, and labor.
  • What is not: thickened edges for a load-bearing wall, a vapour barrier under a heated slab, rebar mats where an engineer calls for them, saw-cut control joints past the standard spacing, and any grading or drainage work around the pour. These are the lines that turn a $7,876 quote into a $9,845 invoice, so ask about each one before signing.
  • Use this as a bid check, not a quote. It prices an average job in average condition. Difficult access, the state of what is being replaced, the season, and a crew booked out three months all move the real number, and none of them are in a per-unit average.

a poured concrete slab in Hilo, HI

$7,876 is the typical number, and three bids on the same scope normally land between $4,847 and $13,328.

That is $1,376 more than the same job priced at the national average.

Why the city changes the number

About 50% of this job is labor — $3,938 of the $7,876 above. Labor is the only part that moves locally; a bundle of material costs what it costs wherever it is nailed down.

Cement Masons and Concrete Finishers near Hilo average $85,470 a year, against a U.S. mean of $60,050. That is a factor of 1.423, so the labor half is scaled by it and the material half is not.

Source: BLS does not publish a metro figure for cement masons and concrete finishers near Hilo, HI, so this is the Hawaii state average, SOC 47-2051.

What the quote should include

The lines that turn a quote into an invoice

Ask about each of them before you sign. On a job this size they are the difference between $7,876 and something a quarter higher.

Use it as a bid check, not a quote

This prices an average job in average condition. Access, the state of what is being replaced, the season, and a crew booked out three months all move the real number, and none of them are in a national average.

If a bid lands outside $4,847 – $13,328, that is not automatically wrong — but it is the question worth asking out loud.