Concrete for a 12″ × 12″ footing, 10 ft long

Concrete for the footing
0.41cubic yards
12″ × 12″ × 10 ft — 11 ft³ including 10% waste
Section through the footingwall12″ wide12″2 × #4 continuousRuns 10 ftProjection each side: 2.0″Thickness OK
Ready-mix0.41yd³
80 lb bags0.6 ft³ per bag19bags
60 lb bags0.45 ft³ per bag25bags
Volume (exact)before waste10ft³
Volume (order this)+10%11ft³
Rebar (2 × #4 continuous)no laps — one stick covers it20linear ft
20 ft rebar sticks1sticks
Form boardsboth sides, if the trench will not stand20ft²
Thickness check12″ is at least 6″ and at least a third of the widthOK

Notes

  • 12″ thick on a 12″ wide footing satisfies the usual rule: at least 6″, and at least as thick as the footing projects past the wall on each side. Below that the footing bends before it spreads the load.
  • Rebar is what makes it a footing rather than a strip of concrete. 2 continuous #4 bars are the IRC minimum for a reinforced footing, laps included here at 20″ — 20 linear ft in total, or 1 sticks of 20 ft.
  • Under 1 yd³ bagged mix is affordable, but a footing still has to go in continuously. Mix ahead, have help, and do not start until everything is in the trench.
  • Bottom of the footing goes below the frost line and onto undisturbed soil. Pouring onto backfill or into a trench with loose spoil in the bottom means the footing settles no matter how much steel is in it.

Volume

12″ × 12″ × 10 ft is 11 ft³ once 10% is added for an uneven trench bottom — 0.41 cubic yards, or 19 bags of 80 lb mix if you are going that route.

Rebar, laps included

2 continuous #4 bars are the IRC minimum for a reinforced footing, and footings 20″ and wider normally take three. Over 10 ft that is 20 linear ft with no laps at 20″ each — 1 sticks of 20 ft rebar.

The laps are the part people forget when they order steel, and running short mid-pour is not a recoverable mistake.

Thickness

The rule is at least 6″, and at least as thick as the footing projects past the wall on each side. Below that the footing bends before it spreads load, and the reinforcement is being asked to do a job the geometry will not let it do.

Forms

20 ft² of board if the trench will not stand on its own. Firm undisturbed soil holds a clean trench and you can pour straight against it; sand, fill or anything that has been rained on will not.

Where it sits matters more than what is in it

Below the frost line, on undisturbed soil. Pouring onto backfill or into a trench with loose spoil in the bottom means the footing settles no matter how much steel went in.