PourGaugeHow much concrete you actually need, and what to mix into it.

Concrete for 3 steps: 42″ wide, 6″ rise, 10″ run

Concrete for 3 steps
0.36cubic yards
42″ wide, 6″ rise, 10″ run — 9.63 ft³, or 17 bags of 80 lb mix
Section2.50 ft projection1.50 ft3 steps6″ rise · 10″ run6 step-blocks of concretenot 3 — the bottom carriesthe full depth above it2R + T = 22.0″
Ready-mix0.36yd³
80 lb bags17bags
60 lb bags22bags
Volume (order this)+10% waste9.63ft³
Total rise3 × 6″1.5ft
Total run3 × 10″ — how far it projects2.5ft
Gravel base (6″)4.4ft³
Side formstwo stepped cheeks5ft²
Riser boards3 risers, 42″ wide5.3ft²
Rebar #4 @ 12″ grid28linear ft
Code check — rise6″ against the 7¾″ IRC maximumOK
Code check — run10″ against the 10″ IRC minimumOK
Comfort (2R + T)outside the 24–25″ range carpenters work to22in

Notes

  • Concrete goes up with the square of the step count, not in a straight line. The bottom step carries the full depth of everything above it, so 3 steps is 6 step-blocks of material, not 3. Multiplying one step's volume by 3 — which is what most step calculators do — would give 4.4 ft³ instead of the real 8.8.
  • 6″ rise and 10″ run are both inside the IRC limits (7¾″ maximum rise, 10″ minimum run). The rule that catches people out is the third one: no more than ⅜″ variation between the tallest and shortest riser in a flight. With concrete you get one attempt at that.
  • 2R + T comes to 22″, outside the comfortable 24–25″ band. These will feel cramped and quick. Adjusting the run by an inch usually fixes it without changing the total rise.
  • Get the total rise right first, then divide. Measure from the finished landing down to the finished grade — 1.5 ft here — and divide by a whole number of steps. Fudging the bottom riser to absorb an error is exactly what the ⅜″ rule exists to prevent.
  • They project 2.5 ft from the wall. That is the measurement that collides with paths, driveways and property lines, and it is usually discovered after the forms are built.
  • Compacted gravel under the whole footprint, below the frost line at the front edge. Steps that heave separate from the house at the top and open a gap you can watch grow every winter.

Volume grows with the square, not in a line

This is where step calculators go wrong. The bottom step has to carry the full depth of every step above it, so 3 steps is 6 step-blocks of concrete, not 3.

Multiplying one step's volume by 3 would give 4.4 ft³. The real figure is 8.8 ft³, or 0.36 cubic yards once 10% waste is added — 17 bags of 80 lb mix.

What it takes up

1.5 ft of total rise, projecting 2.5 ft from the wall. That projection is the measurement that collides with paths, driveways and property lines, and it is normally discovered after the forms are built.

Two different checks

Code. The IRC allows a maximum 7¾″ rise and requires at least a 10″ run. There is a third rule that catches more people: no more than ⅜″ variation between the tallest and shortest riser in one flight. With concrete you get exactly one attempt at that.

Comfort. Carpenters check 2 × rise + run, and want it between 24 and 25 inches. These come to 22″. Steps can satisfy code and still feel wrong underfoot, and this is the check that catches it.

Order of work

Measure total rise from the finished landing to the finished grade, then divide by a whole number of steps. Adjusting the bottom riser to absorb an error is precisely what the ⅜″ rule exists to prevent.

Compacted gravel under the whole footprint, below the frost line at the front edge. Steps that heave separate from the house at the top and open a gap that grows every winter.

Nearby sizes

Read more